One Braham, London
BT’s new headquarters in London spans 22 floors, including a basement and lower basement, as part of a £250 million development.
The project covered 4,000 square meters of floor coatings within a total floorspace of 328,000 square meters. Works included spraying, floor coatings, resin flooring, and general painting and decorating.
- Duration of Job: 12 months
- Approx Value: £368,000