One Braham, London

BT’s new headquarters in London spans 22 floors, including a basement and lower basement, as part of a £250 million development.

The project covered 4,000 square meters of floor coatings within a total floorspace of 328,000 square meters. Works included spraying, floor coatings, resin flooring, and general painting and decorating.

  • Duration of Job: 12 months
  • Approx Value: £368,000